Boiler House Replacement
The Donegal Mutual Insurance Boiler House replacement included demolition of the existing maintenance building. In its place features a 3,774 SF maintenance and boiler plant building. The new boilers within the plant replaced the existing boilers located in the main building. The new natural gas boilers have a fuel oil back-up system allowing for future building expansions with the capacity to add additional boilers if needed. The project also involved the addition of a new emergency back-up generator that is be located adjacent to the boiler plant along with a revised layout of the parking areas.
Project Info
- Location: Marietta, PA
- Client: Donegal Mutual Insurance
- Architect: BLT Architects
- Awards: 2016 Award of Merit, ABC Keystone
- Square Footage: 3,840
- Year Completed: 2015
- Expertise: General Contracting, MEP Coordination, Preconstruction, Self-Perform, Virtual Design & Construction
- Sector: Commercial, Industrial
Key Team Members
-
Don Weeks
Senior Project Manager
-
Alan Miller
Project Superintendent
-
Walt Taylor
Senior Preconstruction Project Manager